2023 Projects

STH 16 Multi-Use Bicycle/Pedestrian Bridge Proposed Project.  

Due to a delay in installing the bike/pedestrian bridge, the project is extending into Spring of next year.  The contract has been extended to a final completion date by May 31, 2024.

2024 Projects

Overview Map for projects on County Roads

STH 108 WisDOT Road Construction Project from West Salem north to the County Line.  

Culvert replacement, guardrail work, and milling and asphalt overlay on STH 108 will begin on April 8th, 2024 and anticipated to end around mid-June 2024.  There will be some road delays and flaggers will be controlling traffic. Contact person Ryan Franzini (920) 360-7383. 

        STH 108 Closure Schedules.

    CTH D Bridge.  WisDOT Construction 2024.  Bridge replacement on CTH D just north of CTH W.  

    CTH DE County Road Construction 2024.

    Drogseth Bridge.  WisDOT Construction Praoject 2024.

    CTH E County Road Construction 2024.

    CTH JJ County Road Construction 2024.

    CTH M La Crosse River Bridge.  WisDOT Construction 2024.  

    CTH P County Road Construction 2024.

    CTH W County Road Construction 2024.

    Casberg Coulee Bridge Replacement 2024


    2025 Projects

    CTH M Bridge B320014, over Russlan Coulee Creek. Estimated Construction Year 2025 to replace the bridge.  Documents attached.

    5436-00-05_Preliminary Plan

     
    CTH B (IH90 to CTH J).  Estimated Construction Year 2025.  Roadway Construction Project.  Documents attached.

    CTH FO (CTH F to CTH OA).  Widening Shoulders Project.  Estimated construction year 2025.

    Mohican Trail Bridge Replacement Project.  Town of Onalaska, construction projected for 2025. Please contact Erik Meyer, Project Engineer, Westbrook Associated Engineers, Inc. by phone at (608) 588-7866, or email at [email protected] for information on this project.

    CTH U Town of Burns.  Estimated construction year 2025.  Curve Reconstruction Project 0.3 miles west of Rockland.

    CTH XX Design.  Projected for construction in 2025.  Proposed reconstruction and realignment of the CTH XX/CTH OT intersection reconstruct CTH XX through New Amsterdam. 

    • CTH XX plans                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 

      2026 Projects

      CTH M Bostwick Creek Bridge Replacement. Town of Barre.  Estimated construction year is 2026.  Proposed work includes bridge replacement.  

        CTH OT Design.  Estimated construction year is 2026. Proposed roundabout at the intersection of County Rd OT and Commerce Rd/Corporate Dr.  This project is in the preliminary design stages.

        Future Projects

        CTH M Construction Project & Bostwick Creek Bridge. From CTH O to CTH I, in the Town of Barre. Proposed work includes bridge replacement, roadway grading and widening, paving, and culvert and drainage work. 

        Please contact Ross Johnson, CBS Squared, Inc., by phone at  (715) 861-2236, or email at [email protected] for project information.

          On-Going Maintenance Projects

           

          WisDOT Projects.  Follow these links for information on Wisconsin Department of Transportation (WIDOT) projects in La Crosse County.  

          USH 53 Project