Questions or Concerns about projects can be directed to Joe Langeberg at 608-786-3813 or [email protected], unless otherwise stated in the project description. 

2022 Projects

WIDOT Projects.  Follow this link for information on Wisconsin Department of Transportation (WIDOT) projects in La Crosse County.

CTH M Construction Project.  From CTH B to CTH O.  Project Start Date is April 4th, 2022.  Planned Completion Date is September 15th, 2022.  If you need further information about this project, please contact Mat Palkowski, Project Engineer at (608) 792-2881 (Field Office Number)

CTH TT Pavement Project.  From CTH T to CTH V.  Planned for construction late summer through early fall 2022.  Open to traffic with flaggers.

CTH V Village of Holmen Utility Project. Utility work on CTH V (Long Coulee Road) by the Village of Holmen. 

Please contact Chris Dahl, Village of Holmen, by phone at (608) 526-6322, or email at [email protected] for information on this project.  Projected for construction in 2022.

Future Projects

CTH D Bridge Design Project.  Bridge replacement on CTH D just north of CTH W.   

CTH M La Crosse River Bridge Replacement Proposed Project.  

CTH M Construction Project & Bostwick Creek Bridge. From CTH O to CTH I, in the Town of Barre. Proposed work includes bridge replacement, roadway grading and widening, paving, and culvert and drainage work. 

Please contact Ross Johnson, CBS Squared, Inc., by phone at  (715) 861-2236, or email at [email protected] for project information.

  • Public Information Meeting will be held June 13, 2022, from 4 pm to 6 pm, at the Town of Barre Hall, W3541 County Road M, La Crosse, WI.  The format of the meeting will be open house, with brief presentations starting at 4:00 pm and time for questions afterward.  Project design engineers and the La Crosse County Highway Department will be present to discuss the projects and answer your questions.  Forms will be available at the meeting to provide written comments.  The town hall is wheelchair accessible.  Assistance for persons with sight, speech, or hearing disabilities is available through 711 Wisconsin Relay and call-in # (608) 786-4788.  Interpreter services may be requested by contacting the highway department at least 5 days prior to the meeting.

CTH ZM 2023 Construction Project.  From CTH Z to CTH OT, in the Town of Onalaska. 

Please contact Noah Hofrichter, Origin Design, by phone at (563) 556-2464, or E-mail at [email protected] for project information.

Mohican Trail Bridge Replacement Project.  Town of Onalaska, construction projected for 2023. Please contact Erik Meyer, Project Engineer, Westbrook Associated Engineers, Inc.
by phone at (608) 588-7866, or email at [email protected] for information on this project.

STH 16 Multi-Use Trail and Bicycle/Pedestrian Bridge Proposed Project.

CTH XX Design.  Proposed reconstruction and realignment of the CTH XX/CTH OT intersection, reconstruct CTH XX through New Amsterdam.  Projected for construction in 2023. 

CTH B French Island Roadway Reconstruction.  Clinton Street to Lakeshore Drive.

The design phase of the La Crosse County sponsored County B, French Island project is currently on hold until construction funding is secured for the project.    

The County is currently pursuing funding assistance through the federally sponsored Surface Transportation Program (STP).  Applications will be submitted with a plan to construct the project over a two year duration, targeting a start date in 2026.  Successful grant applicants will be notified in summer of 2022.  If the County is successful in securing STP funding for the County B project; the website will be updated with a project schedule which will include updated timelines for public involvement activities, real estate acquisition, and utility relocations – these activities will be planned in advance of the 2026 (goal) construction start.

Questions or concerns about this project can be directed to Mary Beth Pettit at 414-467-8912 or by email at [email protected].

CTH OT Design Project.  Proposed roundabout at the intersection of County Rd OT and Commerce Rd/Corporate Dr.  This project is in the preliminary design stages.  Estimated construction year is 2023.  Rollout of plans is available at the Town of Onalaska town hall for public viewing. 

On-Going Maintenance Projects

Urban Mowing - State Highways.  Learn more about Urban Mowing policies at WI DOT Mowing